EICR/2026/46859

109 Fairmont Road, Spalding · Trent Valley Inspections · officer Callum Hayes

RejectedDelivery: Pending

Certificate document

Source PDF received from the contractor

Electrical Installation Condition Report

BS 7671 · Requirements for Electrical Installations · 18th Edition

EICR/2026/46859

Page 1 of 6

Section A — Details of the client

ClientLincolnshire Housing Partnership
AddressMarsden House, Grimsby
UPRN100031026441

Section B — Installation address

Address109 Fairmont Road, Spalding
PostcodePE11 5AB
OccupierLiam Ellison

Section C — Purpose of the report

PurposePeriodic inspection of the fixed electrical installation
Date of inspection10 Mar 2026
Records availableYes — previous EICR held on file

Section D — Summary of the condition of the installation

General conditionServiceable, no immediate danger identified
Overall assessmentUnsatisfactory
Next inspection recommended10 Mar 2031

Section E — Observations and recommendations

ItemObservationCode
1Bathroom supplementary bonding not verifiedC2
2No RCD protection on lighting circuitC3

Section F — Declaration

Inspected and tested byA. Dhillon
On behalf ofTrent Valley Inspections
Scheme registrationNICEIC 0284/1187

Signature

Date

10 Mar 2026

This document is a demonstration facsimile generated for the LHP Compliance Portal preview.

Extracted information

Read automatically from the document

Property
109 Fairmont Road, Spalding99%
Address
PE11 5AB · UPRN 10003102644197%
Inspector
A. Dhillon95%
Inspection date
10 Mar 202699%
Expiry date
10 Mar 203198%
Overall result
Unsatisfactory96%
Risk level
High93%

Observations

  • C2Bathroom supplementary bonding not verified
  • C3No RCD protection on lighting circuit

Quality assurance

Automated policy checks run against every incoming certificate before an officer decision.

2 open findings
  1. Received
  2. Data Extracted
  3. Returned
  4. 4Manager Approval
  5. 5Delivered

Extraction confidence

94.8%

Delivery audit trail

Every step from receipt to tenant download, timestamped for auditing

  1. Certificate created

    Received from contractor portal · CERT-5007

  2. Data extracted

    18 fields extracted · property matched on UPRN

  3. Compliance Review completed

    Automated checks run against LHP electrical policy

  4. Rejected by officer

    Callum Hayes returned the certificate to the contractor